Autor
|
Titel
|
Jahr
|
Band Seite
|
|
|
|
|
|
|
C. Rachoy and M. Scheikl |
Anthropogenic Caused Mass Movements and their Impact on Railway Lines in Austria |
2006 |
2 639 - 643 |
|
S. Vollsinger and K. Hartleitner |
The Arlbergbahn after the August 2005 Floods - Destruction by SlopeFailures and Reconstruction by the OEBB-Infrastruktur Bau AG |
2006 |
2 645 - 655 |
|
M. Mori, T. Hosoda and S. Margaryan |
Landslide Management by Community Based Approach in the Republic of Armenia |
2006 |
2 657 - 665 |
|
E. Hernandez and R. Prieto |
Strategy for Flood Mitigation in Mocoties Basin, Merida, Venezuela, after the Torrential Event on February 11th, 2005 |
2006 |
2 667 - 674 |
|
K. Lorsirirat and H. Maita |
Soil Erosion Problems In Northeast Thailand: A Case Study from the View of Agricultural Development in a Rural Community Near Khon Kaen |
2006 |
2 675 - 686 |
|
T. Honda, K Yamanaka, H. Iita, M. Matsui, K Fujiwara and A. Maeda |
Sustainable Disaster Prevention Measures around the Kirishima Volcano |
2006 |
2 687 - 694 |
|
T. Sakaguchi, T. Nagai and T. Sakaguchi |
Study of Risk Management at Sabo (Erosion Control) Office under Direct Control of the Central Government |
2006 |
2 695 - 703 |
|
G. Fiebiger |
Landslide Control: Tool of the Chain of Functional Structures in Systematic Debris Flow Control |
2006 |
2 705 - 713 |
|
A. Kipfer, H. Kienholz and S. Perret |
Risk Management Cone (RMC) - A Three Dimensional Risk Management Concept |
2006 |
2 715 - 723 |
|
E. Simoncsics |
Development of Earthquake-and Landslide-Proof Public Buildings and their Transformation into Shelters in Case of Emergency |
2006 |
2 727 - 732 |
|
I. Mach |
Development of Earthquake-and Landslide-Proof Residential Houses in KIT-System |
2006 |
2 733 - 740 |
|
T. Kubota and H. Omura |
Traveling Distance Analysis of Landslides in 2005?s Kyushu Disaster Associated with its Application to the Land Use Restriction |
2006 |
2 743 - 748 |
|
K. Akiyama, J. Kurihara and K. Ogawa |
Characteristics of Slope Failure Induced by the Mid Niigata Prefecture Earthquake and the Snow Melting after the Snow Term |
2006 |
2 749 - 758 |
|
Y. Takahashi, K. Miki, E. Nozawa and T. Sakai |
Disaster Monitoring and Warning System by the Niigata Prefectural Government after the Mid Niigata Prefecture Earthquake |
2006 |
2 759 - 768 |
|
S. Yamaguchi, H. Nishii, S. Motousu, K. Kondo, A. Ikeda and M. Shimizu |
Management against Sediment Disasters in the Imogawa River Basin Caused by the Mid Niigata Prefecture Earthquake in 2004, Japan |
2006 |
2 769 - 777 |
|
J. Heumader |
The 2005 Flood and Sediment Disaster in the Western Parts of Tyrol/Austria - Facts and Conclusions |
2006 |
2 779 - 784 |
|
J. Kurihara, N. Takezawa, H. Terada and M. Matsui |
Circumstances in the Utilization of the Soil Cement in Sabo Works in Japan |
2006 |
2 787 - 795 |
|
S. Pathak, R. K Poudel and B. R. Kansakar |
Application of Probabilistic Approach in Rock Slope Stability Analysis - An Experience from Nepal |
2006 |
2 797 - 802 |
|
M. B. Shrestha and T. Miyazaki |
GIS Application on Drainage Network Extraction |
2006 |
2 803 - 813 |
|
V. Dangol |
Status of Landslide Hazard Mapping in Nepal |
2006 |
2 815 - 819 |
|
S. Chen, Y. Ko and T Wu |
Hazard Mapping Program inTaiwan: Compared to the Experience of Austria and Japan |
2006 |
2 821 - 827 |
|
Wehrmann H. , Hübl J., Holzinger G. |
Classification of Dams inTorrentialWatersheds |
2006 |
2 829 - 838 |
|
H. Wehrmann, J. Hubl and G. Holzinger |
Classification of Dams inTorrentialWatersheds |
2006 |
2 829 - 838 |
|
Hodel H., Petrascheck A. |
EINSCHRÄNKUNGEN BEI ABFLUSS- UND GESCHWINDIGKEITSMESSUNGEN SOWIE UNSICHERHEITEN BEI VERFAHREN ZUR ABSCHÄTZUNG VON HOCHWASSERSPITZEN IN WILDBÄCHEN |
2008 |
1 111 - 120 |
|
Inoue K., Mori T., Mizuyama T. |
TWO LARGE LANDSLIDE DAMS AND OUTBURST DISASTERS IN THE SHINANO RIVER, CENTRAL JAPAN |
2008 |
1 121 - 129 |
|
Jenzer J., Carvalho Pereira S., Federspiel M., Boillat J.-L. |
MODELLVERSUCHE DER RHONE BEI VISP (SCHWEIZ) UNTER BETRACHTUNG MEHRERER WASSERBAULICHER ASPEKTE |
2008 |
1 131 - 139 |
|
Jordan F., Garcia Hernandez J., Boillat J.-L., Schleiss A. |
FLOOD FORECAST AND FLOOD MANAGEMENT MODEL - OPTIMIZATION OF THE OPERATION OF STORAGE POWER PLANTS FOR FLOOD ROUTING |
2008 |
1 141 - 151 |
|
Merz B., Kreibich H., Apel H. |
FLOOD RISK ANALYSIS: UNCERTAINTIES AND VALIDATION |
2008 |
1 15 - 24 |
|
Jud M., Loat R. |
DAS LINTHWERK ZWISCHEN GESTERN UND MORGEN |
2008 |
1 153 - 164 |
|
Krassnitzer T., Stephan U. |
HOCHWASSERSCHUTZ KÖTSCHACH/MAUTHEN - VERGLEICH VON SOHLSTABILISIERUNGSMASSNAHMEN IN DER GAIL |
2008 |
1 165 - 176 |
|
Mani P., Schmocker P., Bollaert E., Andres M. |
EIN FRÜHWARNSYSTEM FÜR DEN THUNERSEE - HYDRO-METEOROLOGISCHE INDIKATOREN FÜR DEN BETRIEB DES ENTLASTUNGSSTOLLENS IN THUN |
2008 |
1 177 - 186 |
|
Pohl R., Bornschein A. |
RISIKOABSCHÄTZUNG FÜR EINEN HYPOTHETISCHEN TALSPERRENBRUCH |
2008 |
1 187 - 197 |
|
Rosier B., Boillat J.-L., Schleiss A.J. |
OUTFLOW ANGLE FOR SIDE WEIRS IN A CHANNEL WITH MOBILE BED AT FLOOD DISCHARGES |
2008 |
1 199 - 208 |
|
Schober S., Formann E., Mandler H., Habersack H. |
EIGENDYNAMISCHE FLUSSMORPHOLOGISCHE PROZESSE IN ZUSAMMENHANG MIT FLUSSAUFWEITUNGEN ALS PRAXISBEISPIEL FÜR DEN MODERNEN WASSERBAU |
2008 |
1 209 - 219 |
|
Siegel H., Schabl A. |
INTEGRATED LAND USE PLANNING AND RIVER BASIN MANAGEMENT (ILUP) |
2008 |
1 221 - 228 |
|
Stiefelmeyer H., Hlatky T. |
HORA - AN AUSTRIAN PLATFORM FOR NATURAL HAZARDS AS A NEW WAY IN RISK COMMUNICATION |
2008 |
1 229 - 236 |
|
Vondrak D. |
GEWÄSSERBETREUUNGSKONZEPT DORNBIRNERACH - WASSERWIRTSCHAFTLICHE ERGEBNISSE |
2008 |
1 237 - 246 |
|
Zarn B. |
ENTWICKLUNKGSKONZEPT ALPENRHEIN |
2008 |
1 247 - 258 |
|
Petrascheck A. |
WIEVIEL SCHUTZ VOR NATURGEFAHREN KÖNNEN WIR VERSPRECHEN? |
2008 |
1 25 - 30 |
|
Bertschi W., Hunziker G., Kienholz H. |
EMPIRISCHE MODELLE ZUR GESCHIEBEFRACHTABSCHÄTZUNG KALIBRIERUNG UND EINGRENZUNG UNTERSCHIEDLICHER MODELLE |
2008 |
1 261 - 269 |
|
Bezzola G.R. |
"UNERWARTETE PROZESSE IN EINEM GESCHIEBESAMMLER - DER GESCHIEBESAMMLER "STIGLISBRÜCKE" AM SCHÄCHEN WÄHREND DES HOCHWASSERS VOM AUGUST 2005" |
2008 |
1 271 - 282 |
|
Chen S., Wu C., Ko Y., Huang B. |
RISK ASSESSMENT OF DEBRIS FLOW DISASTER IN SONGHE COMMUNITY IN TAIWAN |
2008 |
1 283 - 294 |
|
Chiari M., Mair E., Rickenmann D. |
GESCHIEBETRANSPORTMODELLIERUNG IN WILDBÄCHEN UND VERGLEICH DER MORPHOLOGISCHEN VERÄNDERUNG MIT LIDAR DATEN |
2008 |
1 295 - 306 |
|
Di Pietro P., Tinti M. |
REMEDIAL WORKS AGAINST DEBRIS FLOWS AFTER THE 2000 FLOODS IN VALLE D'AOSTA |
2008 |
1 307 - 317 |
|
Stalzer W. |
DER ALPENRHEIN - VERSUCH EINER NACHHALTIGEN ENTWICKLUNG - FÜR DEN GRÖSSTEN ALPINEN WILDFLUSS |
2008 |
1 31 - 38 |
|
Frick E., Kienholz H., Roth H. |
SEDEX - EINE PRAXISTAUGLICHE METHODIK ZUR BEURTEILUNG DER FESTSTOFFLIEFERUNG IN WILDBÄCHEN |
2008 |
1 319 - 330 |
|
Gertsch E., Kienholz H. |
GESCHIEBELIEFERUNG ALPINER WILDBACHSYSTEME BEI GROSSEREIGNISSEN |
2008 |
1 331 - 342 |
|
Ishikawa N., Inoue R., Hayashi K., Hasegawa Y., Mizuyama T. |
EXPERIMENTAL APPROACH ON MEASUREMENT OF IMPULSIVE FLUID FORCE USING DEBRIS FLOW MODEL |
2008 |
1 343 - 354 |
|
Jäger G., Moser M. |
NUMERISCHE HYDROLOGISCHE UND HYDRAULISCHE SIMULATION DER AUSWIRKUNGEN EINER MöGLICHEN FLUTWELLE IM RAHMEN EINER RISIKOANALYSE UND RISIKOMANAGEMENTS AM SUGGADINBACH |
2008 |
1 355 - 365 |
|
Kaitna R., Kerschbaumer M., Kapeller H., Zlatic-Jugovic J., Zott F., Hübl J. |
OPTIMIERUNG DES GESCHIEBEABLAGERUNGSPLATZES VORDERBERGERBACH, ÖSTERREICH - EIN PHYSIKALISCHER MODELLVERSUCH |
2008 |
1 367 - 377 |
|